A master list tracking all required submittals, their status, review dates, and approvals throughout a construction project.
What is a Submittal Log?
A submittal log is a master tracking document that lists every submittal required on a project, its current status, review dates, and approvals. It is essential for ensuring that no submittal is missed and that the project stays on schedule.
What it Tracks
- Submittal number and description
- Required date (based on the schedule)
- Submitted date
- Review status (pending, approved, revised, rejected)
- Resubmission date
- Final approval date
- Responsible subcontractor
Why it Matters
- Prevents delays from late submittals
- Provides a clear picture of submittal status
- Helps identify bottlenecks in the review process
- Required by most owners and architects
How SpaceCapture Helps
SpaceCapture's submittal tracking module links submittals to schedule activities and provides real-time status dashboards for the project team.
Related Terms
- Submittal
Shop drawings, material data, samples, and product data. Submittals are required primarily for the architect and engineer to verify that the correct products will be installed.
- RFI Log
A master tracking document that records all Requests for Information, their status, responses, and impacts on schedule and cost.
- Construction Specification
A written document that describes the materials, workmanship, and standards required for a construction project.
- Shop Drawing
Detailed drawings prepared by a subcontractor, fabricator, or supplier showing how a specific component will be manufactured and installed.
Looking for software that helps your team capture these inspections in the field? See our field inspection software or construction inspection software.