RFI (Request for Information)
A formal process used in construction to clarify details in the plans or specifications.
What is an RFI?
A Request for Information (RFI) is a standard business process whose purpose is to collect written information needed to clarify the plans, drawings, or specifications.
Why RFIs Matter
- **Clarity** — resolve ambiguities in the contract documents
- **Documentation** — paper trail of decisions
- **Cost control** — prevent rework from unresolved questions
The RFI Process
- **Identification** — sub or GC identifies a gap
- **Drafting** — the question is formally documented
- **Submission** — sent to the architect / engineer
- **Response** — the answer is provided
- **Distribution** — shared with all affected parties
Related Terms
- Submittal
Shop drawings, material data, samples, and product data. Submittals are required primarily for the architect and engineer to verify that the correct products will be installed.
- Change Order
Work that is added to or deleted from the original scope, which alters the original contract amount and/or completion date.