Look-Ahead Schedule
A short-term schedule (typically 2–6 weeks) that provides detailed activity planning beyond the master schedule.
What is a Look-Ahead Schedule?
A look-ahead schedule is a short-term schedule, typically covering 2–6 weeks, that provides detailed activity-level planning beyond the master schedule. It is the bridge between the master schedule and daily planning.
Purpose
- Identify upcoming activities and their prerequisites
- Flag material and equipment needs
- Coordinate subcontractor activities
- Verify that the master schedule is achievable
- Identify potential bottlenecks before they become problems
Typical Content
- Activities planned for the next 2–6 weeks
- Predecessor and successor relationships
- Required materials and equipment
- Subcontractor responsibilities
- Inspection and test requirements
- Constraint and assumption list
How SpaceCapture Helps
SpaceCapture's scheduling integration links look-ahead activities to inspection checklists, ensuring the field team knows exactly what inspections are coming and what needs to be ready.
Related Terms
- Three-Week Look-Ahead
A specific type of look-ahead schedule covering the next three weeks, used for detailed coordination and constraint resolution.
- Critical Path Method (CPM)
A scheduling technique that identifies the sequence of dependent activities determining the shortest possible project duration.
- Gantt Chart
A type of bar chart that illustrates a project schedule, showing the dependency relationships between activities and current status.